{"id":1245,"date":"2025-04-24T16:36:06","date_gmt":"2025-04-24T16:36:06","guid":{"rendered":"https:\/\/ltgh.ge\/?p=1245"},"modified":"2025-05-13T20:27:05","modified_gmt":"2025-05-13T20:27:05","slug":"thurqethis-energetikis-spheros-tsarmomadgenlebi-stumrad-ltg-holding-than","status":"publish","type":"post","link":"https:\/\/ltgh.ge\/en\/thurqethis-energetikis-spheros-tsarmomadgenlebi-stumrad-ltg-holding-than\/","title":{"rendered":"Representatives of the Turkish Energy Sector Visit LTG Holding"},"content":{"rendered":"<p style=\"text-align: justify;\" class=\"translation-block\">At the invitation of <strong>LTG Holding<\/strong>, senior executives from the Turkish energy company <a href=\"https:\/\/www.hkenerji.net\/en\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\"><strong>HK END\u00dcSTR\u0130 ENERJ\u0130\u00a0 <\/strong><\/a> paid a working visit to Georgia.<\/p>\n<p style=\"text-align: justify;\">The visit focused on the design and reconstruction of medium\u2011 and high\u2011voltage (110\u202fkV and above) overhead transmission lines throughout the Transcaucasus region. Plans include replacing existing overhead lines with underground cable systems and reconfiguring overhead lines for improved reliability.<\/p>\n<p style=\"text-align: justify;\">In addition to transmission works, the discussions covered the construction of medium\u2011and high\u2011voltage substations and the outfitting of a state\u2011of\u2011the\u2011art service laboratory, which is intended to become one of the region\u2019s leading testing and maintenance facilities.<\/p>\n<p style=\"text-align: justify;\">Following these talks, both parties agreed to establish a joint regional office, a training center, and a dedicated research laboratory in Tbilisi.<\/p>\n<p style=\"text-align: justify;\">A Memorandum of Understanding was signed, outlining that the active phase of the partnership will commence in June 2025.<\/p>","protected":false},"excerpt":{"rendered":"<p>At the invitation of LTG Holding, the heads of the well-known Turkish company HK END\u00dcSTR\u0130 ENERJ\u0130 paid a business visit to Georgia. The parties discussed the issues of designing and constructing the reconstruction of medium and high voltage (110 kV and above) overhead power lines of the distribution and transmission network in the Transcaucasus region. This includes the replacement of overhead power lines with cable lines, as well as changing the configuration of overhead lines. [\u2026]<\/p>","protected":false},"author":2,"featured_media":1246,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18,23],"tags":[],"class_list":["post-1245","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-elektromomarageba","category-inovaciuri-proektebi"],"_links":{"self":[{"href":"https:\/\/ltgh.ge\/en\/wp-json\/wp\/v2\/posts\/1245","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ltgh.ge\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ltgh.ge\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ltgh.ge\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ltgh.ge\/en\/wp-json\/wp\/v2\/comments?post=1245"}],"version-history":[{"count":10,"href":"https:\/\/ltgh.ge\/en\/wp-json\/wp\/v2\/posts\/1245\/revisions"}],"predecessor-version":[{"id":1298,"href":"https:\/\/ltgh.ge\/en\/wp-json\/wp\/v2\/posts\/1245\/revisions\/1298"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ltgh.ge\/en\/wp-json\/wp\/v2\/media\/1246"}],"wp:attachment":[{"href":"https:\/\/ltgh.ge\/en\/wp-json\/wp\/v2\/media?parent=1245"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ltgh.ge\/en\/wp-json\/wp\/v2\/categories?post=1245"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ltgh.ge\/en\/wp-json\/wp\/v2\/tags?post=1245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}